Our China sourcing service runs on two plans with published prices. The difference is simple: who supplies your products. Buy from our supplier network, or keep your own suppliers and let us manage the order. Both plans include production follow-up, AQL 2.5 quality inspection and shipping arrangements — and both are priced openly below.
Standalone services — quality inspections, factory audits and shipping coordination ordered on their own — are quoted per project. See how standalone services are priced at the bottom of this page.
Sourcing Plan — Buy From Our Supplier Network
We find suitable suppliers for your product, obtain quotations and provide manufacturing solutions — free of charge. You compare our all-in quotation with any quotes you already have, approve the price and sample, and place your order. We then handle production follow-up, quality inspection, warehousing and delivery.
Service fee: $0. All costs — including our margin — are included in the product unit price. You receive one all-in quotation, so you always know the total cost before you commit. We act as your trading partner under this plan, and we say so openly.
- Quality guarantee: if products fail to meet the agreed written specifications, the approved sample or the agreed AQL 2.5 inspection standard, we provide free replacement or compensation. The guarantee is anchored to these documented, verifiable criteria — we confirm them with you in writing before production starts, so both sides know exactly what ‘acceptable quality’ means. Subjective expectations outside the agreed criteria are not covered.
- Free warehousing: up to 2 months.
- Delivery: door-to-door shipping available on request, in addition to standard port-to-port arrangements.
Order Management Plan — Use Your Own Suppliers
You already have suppliers in China and want to keep those relationships. We coordinate with your suppliers on your behalf: confirming requirements, following up production, inspecting the goods and arranging delivery. When your suppliers send the cargo to our warehouse, we inspect it and arrange onward shipping.
Service fee: 5% of the product value, minimum $100 per order.
- Quality inspection: AQL 2.5 standard, with English reports, photos and videos.
- Quality issues: we negotiate with your supplier to resolve problems, but the final loss is borne by you or your supplier — we do not provide replacement or compensation under this plan.
- Free warehousing: up to 1 month.
- Delivery: door-to-door shipping available on request.
Start an Order Management enquiry
Sourcing Plan vs Order Management Plan
| Sourcing Plan | Order Management Plan | |
|---|---|---|
| Product supplier | Our supplier network | Your own suppliers |
| Service fee | $0 — all costs in the unit price | 5% of product value, min $100 |
| Supplier sourcing & quotation | Free, before you order | Not needed — you have suppliers |
| Production follow-up | Yes | Yes |
| Quality inspection | AQL 2.5 | AQL 2.5 |
| Quality guarantee | Yes — against agreed written criteria | No — we negotiate; loss borne by you or your supplier |
| Free warehousing | 2 months | 1 month |
| Door-to-door delivery | On request | On request |
Order Value Rules
For orders containing multiple products, each product should reach a purchase value of $500 — calculated as an average across all items. For example, four products totalling $2,000 meet the rule, even if one item is below $500.
If the average falls below $500, a $25 handling fee applies to each product under the threshold. This keeps small mixed orders workable without hiding costs in the unit price.
How It Works
1. Send your requirements. Product details, photos or reference links, estimated quantity and destination. Tell us whether you already have a supplier.
2. Get a free quotation. Under the Sourcing Plan, compare our all-in price with any existing quotes. Under the Order Management Plan, we confirm the 5% service scope with you in writing.
3. Confirm quality criteria and order. We agree the written specifications, approved sample and inspection standard before production — this is what the quality guarantee is measured against.
4. Production, inspection, delivery. We follow up production, inspect to AQL 2.5, and arrange shipping — port-to-port or door-to-door as you prefer.
Frequently Asked Questions
What is the main difference between the two plans?
Who supplies the goods — and who carries the quality risk. Under the Sourcing Plan you buy from our supplier network at an all-in unit price, and we guarantee quality against the agreed written criteria. Under the Order Management Plan you buy from your own suppliers and pay us a 5% service fee (minimum $100); we manage and inspect the order, and negotiate quality issues with your supplier, but the final loss stays with you or your supplier.
Is the Sourcing Plan really free?
There is no separate service fee. We act as your trading partner: our margin is included in the product unit price, and the quotation you receive is the all-in price. Nothing is added later without your approval. We publish this openly because a quotation with hidden markups helps no one.
Can I use both plans at the same time?
Yes. If you source several products, you can buy some through our supplier network (Sourcing Plan) and others from your own suppliers (Order Management Plan) in the same project. Each product follows the terms of its plan.
Will you share the supplier information under the Sourcing Plan?
In most cases we do not disclose supplier details under the Sourcing Plan. However, you are welcome to commission a factory audit or visit the producing factory with us before placing your order, so you can assess the manufacturer directly.
How do you conduct quality inspections?
Both plans include inspection to the AQL 2.5 standard by default, performed by our own staff and long-term professional inspectors. You receive an English report with photos and videos. Higher sampling ratios or one-by-one inspection can be arranged and are quoted separately.
What exactly does the quality guarantee cover?
The guarantee applies when products fail to meet criteria that were documented and agreed before production: the written specification sheet, the approved sample, and the AQL 2.5 inspection standard. We confirm these with you in writing so there is no ambiguity later. Expectations that were not part of the agreed criteria — for example, a subjective preference not expressed in the specification — are not covered. If you are unsure whether a requirement can be met, we discuss it before production, not after.
How is the service fee calculated for low-value mixed orders?
Under the Order Management Plan, the minimum service fee is $100 per order. For both plans, the $500-per-product rule is averaged across all items in the order; only when the average falls below $500 does a $25 handling fee apply to each product under the threshold.
Do these prices apply to standalone inspections or factory audits?
No. The two plans above cover our sourcing service. If you only need a one-off inspection, a factory audit or shipping coordination, that is a standalone service quoted per project — see below.
Standalone Services: Quoted Per Project
Not every project needs a sourcing plan. If you already have your purchasing under control and only need a specific task done, we offer standalone services. These are not charged at the plan rates above — each engagement is quoted individually, and the scope and total fee are confirmed with you in writing before any work is booked.
| Service | What it covers | How it is priced |
|---|---|---|
| Quality Inspection | Pre-shipment inspection, during-production checks, container loading supervision. English reports with photos and videos. | Per project, based on factory location, product type, sampling requirements and workload |
| Factory Audit | On-site assessment of supplier background, production facilities and quality control practices. | Per project, based on location, scope and expected workload |
| Shipping Coordination | Shipping arrangements and export documentation for orders you manage yourself. | Per project, based on the agreed delivery terms and scope |
Why per-project pricing for these? Because a one-day inspection near Ningbo and a multi-site audit in another province involve very different work. We quote the actual scope instead of averaging it into a rate that overcharges simple jobs.
The boundary in one sentence: inspections included in a Sourcing Plan or Order Management Plan order follow the plan terms (AQL 2.5); inspections ordered on their own are standalone services quoted per project.
